Rischmoller L, Fischer M, Fox R, Alarcon L (2001).ĤD planning and scheduling (4D-ps): grounding construction it research in industry practice. Proceedings of the 31st International Conference of CIB W78, Orlando, Florida, USA, 23-25 June, 1360-1367ĤD construction sequence planning – new process and data model. M Zhou, X-X Ning, J-S Fan, J-G Nie, X-G Yang (2014).ĤD Multi-Scale Analysis of the Hybrid Zone for Cable-Stayed Bridges with Steel-Concrete Hybrid Girders. Yasumuro Y,Kusakabe S,Dan H,Fuyuki M (2013).ģd barrier-free verification for wheelchair access. SIGraDi 2012 Brasil - Fortaleza 13-16 November 2012, pp. SIGraDi 2003 - Rosario Argentina 5-7 november 2003ģD Printed Textiles from Textile Code: Structural Form and Material Operations. (2003).ġ931 Arte e Revolução: Lúcio Costa e a Reforma da Escola de Belas Artes. Mathur K S, Betts M P, Tham K W (ed.) Pre-proceedings of the first international conference on the management of information technology for construction Singapore, August 1993ĭa Silva Pereira, M., Couri Fabião, A., dos Reis, M.H. Implementation of information technology for themanagement of R and D and competitiveness. SIGraDi 2011 Argentina - Santa Fe 16-18 November 2011, pp. (STMS) Standard Texture Metrology Simulation for General CNC Machining Processes. Valdes Castillo, Francisco Javier (2011). 7th ERES EDUCATION SEMINAR - Henley Business School / University of Reading, December 2-3 2011
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |